View Procedure

Procedure NameIssuance of certificate for design appraisal of loading and unloading equipments, boilers and pressure equipmenst imported for use in transportation
Description

 

 

Category

Procedure for granting certification 

Responsible Agency

Ministry of Transport

Legal basis of the Procedure                

  • Law on Maritime 40/2005/QH11
  • Law on product and goods quality 05/2007/QH12
  • Law on Inland Waterway Transport 23/2004/QH11
  • Decree 132/2008/NĐ-CP Guiding the Law on Product and Goods Quality
  • Circular  11/2016/TT-BGTVT on national technical standards on ship decentralization and shipbuilding, national technical standards on decentralization and construction of high-speed craft, national technical regulations on equipment Ship safety and national technical regulations on shipboard inspection and shipbuilding
  • Circular 26/2010/TT-BGTVT promulgated the National Technical Regulation on manufacture and inspection of loading and unloading means and equipment issued by the Ministry of Transport
  • Circular 199/2016/TT-BTC regulates the rates, the regime of collection, remittance and management of fees for the issuance of certificates of quality assurance and technical safety for machinery, equipment and means of transport There are strict requirements for safety
  • Circular  246/2016/TT-BTC regulates the rates, regime of collection, remittance, management and use of fees for inspection, assessment and issuance of international certificates for ship security

Processing time

Within 3 working days after completing the appraisal

Fee

Certificate issuance fee 50,000 VND / 01 certificate

Inspection fee: According to Circular No 246/2016/TT-BTC

Required documents

No

Type of documents

1

A written request for design evaluation according to set form  (01)

2

03 sets of Equipment design dossier (original) as prescribed in relevant standards and norms. In cases where there are no provisions in minimum standards or design dossiers, the design dossiers shall include:

+ For production and assembly equipment:

* Design narrative

* Design calculations

* General drawings, main structure of equipment

* Drawings of operational principles and major technical specifications

* List of main components, main components with specifications and technical specifications

* Test procedure and test

+ For conversion equipment:

* The design-design narrative relates to the content of the conversion

* Master drawings of pre and post conversion equipment

* Drawings and technical documentation, systems for conversion

* Test procedure and test

Process Steps

Step 1

 Enterprise shall submit dossiers to the Vietnam Register

Step 2

- The Vietnam Register will receive and examine the dossiers: If the dossiers are incomplete according to regulations, guide the enterprise to complete; If the dossier is complete as prescribed, a written appointment must be made for the time of return.

- The Vietnam Register will conduct the design evaluation: If the dossier does not meet the requirements, it shall notify in writing the enterprise; If it satisfies the requirements, the design evaluation certificate shall be made according to a set form, enclosed with a set of design dossiers already appraised.

CategoryProcedure

The following form/s are used in this procedure
TitleDescriptionCreated DateUpdated DateIssued By
APPLICATION OF EVALUATION DESIGN03-08-201603-08-2016Ministry of TransportThis is Dowload File
This procedure applies to the following measures
NameMeasure TypeAgencyDescriptionCommentsLegal DocumentValidity ToMeasure Class
Import of loading and unloading equipments, boilers and pressure equipmenst for use in transportation requires certificate for design appraisal Technical MeasuresMinistry of TransportThe design of the equipment, imported equipment, manufacture, assembly, conversion and utilization of transportation must be evaluated by Vietnam Registry Department and issue certificate of inspection and quality safety technicalPursuant to check the quality certificates of technical safety equipment and facility is regulations, technical standards, the provisions of relevant laws and standards equivalent provisions for ensuring safety and technical quality that corresponds to each type of equipment referred to in Annex I of the Circular 35/2011 / TT-BGTVTCircular 35/2011/TT-BGTVT Regulation on procedures for granting Certificate of technical safety quality of loading and unloading equipment, boilers, pressure equipment used in transport31-12-9999Good